SENTINEL DEFENSE ELECTRONICS · PRODUCT INTELLIGENCE DASHBOARD · FEB 2026LIVE

HARDENED FOR THE
CONTESTED EDGE

Circuit boards, ruggedized processors, and signal-intercept modules built for armored, naval, and unmanned platforms operating in denied environments.

FIELDED SYSTEMS
4,200+
Active deployments across all platform classes
OPERATIONAL AVAILABILITY
99.97%
Mean time between failure · 87,600 hrs MTBF
ALLIED NATIONS DEPLOYED
18
FMS-cleared · NATO STANAG compliant
PRODUCTION WINDOW
≤18 MO
LRIP to full-rate delivery · DFARs compliant
QUALIFICATION STANDARDS
MIL-STD-810H
DO-160G · MIL-STD-461G · MIL-STD-1275E
PLATFORM CLASSES
3
Ground · Naval · Airborne
NEXT ACTION
REQUEST TECHNICAL BRIEF →
Gated library · .mil or corporate email required
MIL-STD-810H VIBRATION & SHOCKDO-160G AIRBORNE EQUIPMENTMIL-STD-461G EMI/EMCMIL-STD-1275E POWER QUALITYMIL-DTL-38999 CONNECTORSAS9100D QUALITY MANAGEMENTITAR REGISTEREDCMMC LEVEL 2 COMPLIANTMIL-STD-704F AIRCRAFT POWERMIL-STD-1553B DATA BUSMIL-STD-810H VIBRATION & SHOCKDO-160G AIRBORNE EQUIPMENTMIL-STD-461G EMI/EMCMIL-STD-1275E POWER QUALITYMIL-DTL-38999 CONNECTORSAS9100D QUALITY MANAGEMENTITAR REGISTEREDCMMC LEVEL 2 COMPLIANTMIL-STD-704F AIRCRAFT POWERMIL-STD-1553B DATA BUS
THREAT ENVIRONMENT ASSESSMENT · FEB 2026

THE ACQUISITION LANDSCAPE
HAS MATERIALLY CHANGED.

Three structural shifts are creating qualification gaps that legacy suppliers cannot close. Program managers who identify compliant subsystem partners early avoid schedule-risk exposure at CDR and PDR gates.

TI-001

SHRINKING PRODUCTION TIMELINES

Program offices are compressing LRIP award-to-delivery windows from 36 months to under 18. Legacy EMS partners lack the certified stockpile and NPI velocity to absorb the schedule risk. Sentinel maintains pre-qualified buffer stock on all Tier-1 components with zero lead-time exposure on critical paths.

47%
Avg. production window compression since FY2021
↓ 19 MO avg.
TI-002

SWAP-C PRESSURE ACROSS PLATFORM CLASSES

Unmanned platforms and next-generation armored vehicles are demanding subsystems that deliver equivalent processing throughput at 30–40% reduced size, weight, and power envelopes. Standard commercial-off-the-shelf solutions fail at operational temperature ranges of −40°C to +85°C. Sentinel's ruggedized SBC line achieves Class-B thermal compliance at 280 g.

38%
Weight reduction vs. legacy SBC baseline
↑ Thermal range
TI-003

SUPPLY CHAIN RESHORING MANDATE

NDAA Section 2533 restrictions and DFARS clause 252.225-7001 are eliminating offshore-sourced semiconductors from DoD-funded programs. Primes face disqualification risk on existing contracts. Sentinel operates a domestic-only supply chain with full country-of-origin traceability to the die level, ITAR-registered and CMMC Level 2 certified.

100%
CONUS-sourced critical components
↑ NDAA compliant
PRODUCT INTELLIGENCE · 6 ACTIVE FAMILIES

QUALIFIED SUBSYSTEMS
BY PLATFORM CLASS

6 / 6 SYSTEMS SHOWN
PROCESSING
SCB-400
PRODUCTION

Ruggedized Single-Board Computer

MIL-spec SBC with Intel Xeon-D architecture, designed for armored vehicle C2 systems requiring full Class-B thermal compliance.

PROCESSOR
Xeon-D 2100 · 16c/32t
WEIGHT
280 g
TEMP RANGE
−40°C to +85°C
POWER
28 VDC · MIL-STD-1275E
APCIFVMBT
MIL-STD-810HMIL-STD-461GDO-160G
SIGNAL INTERCEPT
SIM-700
PRODUCTION

Wideband Signal-Intercept Module

Multi-channel RF intercept module covering 20 MHz–18 GHz, optimized for naval EW suites and shipboard intelligence collection platforms.

FREQUENCY
20 MHz – 18 GHz
CHANNELS
8 simultaneous
DYNAMIC RANGE
120 dB
FORM FACTOR
3U VPX · VITA 65
DDGLCSFFG
MIL-STD-461GMIL-STD-810HMIL-DTL-38999
COMPUTE
HCB-250
LRIP

Hardened Circuit Board — UAV Class

Ultra-low SWAP compute module for Group 3–5 UAS platforms. Conformal-coated, vibration-isolated, with native MIL-STD-1553B and ARINC 429 bus interfaces.

WEIGHT
94 g
POWER
8 W TDP
BUS INTERFACES
1553B · ARINC 429
ALTITUDE
Certified to 55,000 ft
MALE UASHALE UASUCAV
DO-160GMIL-STD-810HMIL-STD-704F
AI/ML INFERENCE
NPU-900
QUALIFICATION

Neural Processing Unit — Edge Inference

Tactical-edge AI inference accelerator for autonomous target recognition and sensor fusion aboard armored and airborne platforms.

THROUGHPUT
25 TOPS INT8
LATENCY
<2 ms inference
WEIGHT
310 g
SECURITY
Type 1 encrypt ready
APCMALE UASUCAV
MIL-STD-810HMIL-STD-461GCMMC L2
POWER MANAGEMENT
RPM-550
PRODUCTION

Ruggedized Power Management Module

Multi-rail power conditioning and management module for shipboard and vehicle applications. Handles 28 VDC military vehicle bus and 115 VAC 400 Hz aircraft power.

INPUT RANGE
16–32 VDC / 115 VAC
OUTPUT RAILS
5 isolated rails
EFFICIENCY
94% peak
ISOLATION
1500 VDC
DDGLCSAPCIFV
MIL-STD-1275EMIL-STD-704FMIL-STD-461G
FIBER/COMMS
FMC-120
PRODUCTION

Fiber-Optic Communications Module

High-bandwidth fiber-optic interface card enabling jam-resistant intra-platform networking aboard next-generation armored vehicles and naval combatants.

BANDWIDTH
10 Gbps per channel
CHANNELS
4 duplex
CONNECTOR
MIL-DTL-38999 ARINC
LATENCY
<100 ns
MBTIFVDDG
MIL-STD-810HMIL-STD-461GDO-160G
PROGRAM CASE FILES · SELECTED DEPLOYMENTS

MISSION BRIEFS
OPERATIONAL PROOF AT PROGRAM SCALE

Unclassified program summaries formatted for engineering review board distribution. Full technical data packages available under NDA upon qualification.

PROGRAM BRIEF · UNCLASSIFIED SUMMARY
PGM-ALPHA-2024

NEXT-GEN IFV COMPUTE MODERNIZATION

Tier-1 Land Systems Prime
European Theater
Bradley successor · 6×6 IFV · 840 vehicles
CHALLENGE

Prime contractor faced a 14-month LRIP delivery window for 840 ruggedized compute nodes. Legacy supplier disqualified under NDAA Section 2533 at T−8 months. Re-sourcing risk threatened CDR milestone and $2.4B program value.

SENTINEL SOLUTION

Sentinel activated pre-certified SCB-400 stockpile with zero NPI lag. Full MIL-STD-810H re-qualification package delivered in 6 weeks. DFARs country-of-origin documentation completed in parallel.

OUTCOME

CDR milestone preserved. First article delivery achieved at T+11 months. No schedule slip. Program manager cited Sentinel as "only vendor with the stockpile and qual documentation to close the gap."

PROGRAM TIMELINE
AWARD
T+0
NPI
T+6 wks
FIRST ART
T+11 mo
LRIP
T+14 mo
SCHEDULE SLIP
0 DAYS
QUAL TIME
6 WKS
COST DELTA
+0.8%
UNITS DELIVERED
840
NATIONS: USA · 3 NATO Partners
WINDOW: 14 months
PROGRAM BRIEF · UNCLASSIFIED SUMMARY
PGM-BRAVO-2023

DESTROYER EW SUITE UPGRADE

Naval Systems Integration Prime
Indo-Pacific Theater
DDG-51 Flight III · 12 hulls
CHALLENGE

Twelve-hull DDG-51 Flight III EW suite upgrade required wideband signal-intercept modules compliant with MIL-STD-461G Class B1 shipboard EMI limits. COTS RF modules failed saltwater corrosion testing at 500-hour mark. Program 9 months from IOC.

SENTINEL SOLUTION

SIM-700 deployed with conformal coating, hermetically sealed connectors (MIL-DTL-38999), and shipboard-grade vibration isolation. Full 1,000-hour salt-fog qualification completed under Navy TEMPEST protocol.

OUTCOME

IOC milestone met on schedule across all 12 hulls. Zero field failures at 18-month mark. NAVSEA engineering review board approved SIM-700 as the baseline for DDG-51 Block II production.

PROGRAM TIMELINE
PDR
T+0
QUAL
T+4 mo
IOC
T+9 mo
PROD
T+18 mo
FIELD FAILURES
0
IOC SLIP
0 DAYS
HULLS OUTFITTED
12 / 12
BLOCK II STATUS
BASELINE
NATIONS: USA · Japan · Australia
WINDOW: 9 months to IOC
ACQUISITION CYCLE ENGAGEMENT

READY TO CLOSE
THE QUALIFICATION GAP?

Sentinel's technical brief library contains full qualification packages, SWAP-C comparison data, and production timeline documentation — formatted for engineering review board distribution. Access requires a .mil or corporate domain email.

REQUEST TECHNICAL BRIEF

Gated access to qualification packages, datasheet PDFs, and SWAP-C comparison matrices. Immediate download upon verification.

SCHEDULE A PROGRAM REVIEW

60-minute session with a Sentinel program engineer. For primes and MoD procurement officers with active RFP or RFI in progress.

4,200+
Fielded Systems
18
Allied Nations
99.97%
Availability
TECHNICAL BRIEF REQUEST
GATED LIBRARY ACCESS
.mil, .gov, or verified corporate domain required

ITAR-controlled distribution · Submissions reviewed within 1 business day